Serving Greater Houston
Mon–Fri 8am–6pm · Sat by appointment
Call for a free quote
(346) 683-3551
Super Speed Remodeling
Super Speed Remodeling
Speed You Can Trust
Remodeled kitchen with a wood island and white perimeter cabinetry

Kitchen remodeling in Houston

Three ways to do a kitchen, and we will tell you honestly which one your house actually needs. Cabinet and counter refresh from 1 week. Full reconfiguration up to 10.

  • Free in-home design visit
  • Fixed written pricing
  • Permits pulled and inspected
Kitchen with white cabinetry, a dark island and wall ovens
Scope

What a kitchen job includes

One crew handles demolition through final trim. Plumbing and electrical are performed by our licensed trade partners, who report to your project lead rather than to you.

  • Full gut renovation, including layout changes
  • Cabinet replacement, or refacing when the boxes are sound
  • Quartz, granite and solid surface countertop fabrication
  • Backsplash, sink, faucet and appliance installation
  • Island builds, including adding power and plumbing
  • Recessed and under-cabinet lighting, plus panel and circuit updates
  • Flooring, including tile, LVP and engineered hardwood
  • Permit handling and inspection scheduling where scope requires it
Pick your scope

Refresh, replace or reconfigure

Most kitchens fall into one of three tiers. The jump in price between them is driven almost entirely by whether cabinetry is replaced and whether anything moves.

Kitchen with a navy island, counter stools and white cabinetry

Refresh

Same footprint, same boxes. New countertops, backsplash, sink, faucet, hardware, and either paint or door refacing. The cheapest visible change per dollar spent.

  • Countertop and backsplash replacement
  • Cabinet painting or door refacing
  • Sink, faucet and hardware swap
1–2 weeks · $12,000–$25,000
Kitchen with white cabinetry and a fluted wood island

Replace

New cabinetry in the existing layout, plus counters, flooring, lighting and appliances. Plumbing and gas stay roughly where they are, which keeps permits simple.

  • Full cabinetry replacement
  • Flooring and lighting package
  • Appliance install and hookup
3–5 weeks · $35,000–$75,000
Open kitchen with dark cabinetry and an adjoining dining area

Reconfigure

Walls come out, the island moves, plumbing and electrical get rerouted. Permits and inspections apply. The biggest change to how the room actually works.

  • Wall removal and structural headers
  • Plumbing and electrical reroutes
  • Permits, inspections and engineering
6–10 weeks · $75,000–$160,000
Kitchen counter and cabinetry detail with a quartz worktop
Single-scope work

Countertops and cabinetry on their own

Not every kitchen needs a full remodel. If the layout works and the boxes are solid, replacing the two surfaces you actually touch every day gets you most of the way there.

  • Laser templating and seam planning before fabrication
  • Quartz, granite, quartzite and solid surface
  • Undermount sink cutouts and edge profile selection
  • Refacing with new doors, drawer fronts and matching veneer
  • Soft-close hardware and drawer box upgrades
  • Backsplash tile installed to the underside of the uppers
Finish Selection Package

Choose your finishes before demo day

Every client works through the same curated book. One option per category, locked in writing, so nothing is being decided while a crew stands in your kitchen.

Cabinetry — Door Styles & Finishes

Framed construction, classic box. Shaker is a flat recessed panel that works in traditional and modern kitchens alike. Antique White is a raised layered panel; Maple Walnut is a raised panel in a deep stain.

White Shaker cabinet door
White Shaker
Framed
Light Grey Shaker cabinet door
Light Grey Shaker
Framed
Grey Shaker cabinet door
Grey Shaker
Framed
Maple Shaker cabinet door
Maple Shaker
Framed
Matte Black Shaker cabinet door
Matte Black Shaker
Framed
Antique White raised panel cabinet door
Antique White
Raised panel

Also available Maple Walnut raised panel, plus Natural Box framed (Ocean Blue, Urban Oak, Cypress Green) and European frameless slab fronts (Cosmo Sand, Roma Clay, Piano Grey, Oxford White). Frameless drops the face frame for a wider opening and full access to the box.

Quartz Countertops

Engineered quartz for kitchen, island and vanity surfaces. Non-porous and sealed for life, so there is no annual resealing the way there is with natural stone.

Frost White quartz
Frost White
Arctic White quartz
Arctic White
Iced Gray quartz
Iced Gray
Carrara Mist quartz
Carrara Mist
Carrara Morro quartz
Carrara Morro
Calacatta Laza quartz
Calacatta Laza

Twelve in the book Also Iced White, Marfitaj, Carrara Miksa, Carrara Breve, Calacatta Belaros and Calacatta Rusta. Signature upgrades (Cristallo and Taj Mahal quartz, or a hand-picked slab from the yard) are slab-selected and priced by the square foot after templating.

LVP Flooring

Waterproof rigid core with an attached pad, for living areas, hallways and bedrooms. Self-levelling is quoted against slab condition once the existing floor is out.

Platinum Harvest LVP
Platinum Harvest
Light natural oak
Alamo Oak LVP
Alamo Oak
Mid rustic oak
Stormy Elm LVP
Stormy Elm
Dark weathered
Alpine Summit LVP
Alpine Summit
Cool gray oak

Interior Paint

Six house neutrals that work with every tile and cabinet selection in the book. Ceilings are flat white and trim and doors are semi-gloss white unless you tell us otherwise. Colours shown are sampled from the printed selection package.

Shoji White
Warm neutral
Repose Gray
Warm gray
Alabaster
Soft white
Pavilion Beige
Warm greige
Ellie Gray
Mid gray
Pure White
Clean white

Hardware Finish

One finish, carried through the whole house: entry sets, interior levers, cabinet pulls, bath accessories and ceiling fans.

Black hardware finish
Black
Chrome and brushed nickel hardware finish
Chrome / Nickel

Upgrades A gold trim package and smart home features are available on request and priced separately.

Our process

What happens between the first call and the last walkthrough

01Consultation

About an hour at your house. Measurements, a look at existing conditions, and a straight conversation about budget before design starts.

02Design & quote

Layout, cabinet line and finish selections with a line-item written price. Revisions are free. You owe nothing until you sign.

03Order & schedule

Cabinets and counters are ordered and staged before demo day, because cabinet lead time is what actually sets your start date.

04Install & close out

Consecutive working days, temporary kitchen set up on day one, then a walkthrough, punch list and written warranty handover.

Pricing

What a Houston kitchen actually costs

We do not quote over the phone, because the honest answer depends on what is behind your walls. What we can do is be transparent about the ranges and the variables that move them.

Project
Typical range
Typical timeline
What moves the price
Countertops only
$4,500 – $12,000
1–2 weeks
Material, slab count, edge profile, number of seams
Kitchen refresh
$12,000 – $25,000
1–2 weeks
Counter material, refacing vs. paint, appliance swap
Kitchen replacement
$35,000 – $75,000
3–5 weeks
Cabinet line and lead time, counter material, lighting scope
Kitchen reconfiguration
$75,000 – $160,000
6–10 weeks
Wall removal, structural work, plumbing and electrical reroutes, permits

Financing

0% interest for 18 months on approved credit, or fixed-rate terms out to 120 months on larger projects. Pre-approval takes a few minutes and does not change your quote.

Payment schedule

10% at signing, 40% when cabinets and counters are delivered to your house, 40% at substantial completion, and the final 10% only after you sign off on the punch list.

Change orders

If we find something behind a wall, work on that area stops. You get photos, a written price, and the job does not resume until you approve it in writing.

$1,500 off a complete kitchen or bathroom remodel

Book your free consultation by October 31, 2026 and mention this offer. Applies to projects of $15,000 or more, signed within 30 days of quote. Cannot be combined with other offers.

Claim This Offer
Kitchen questions

What homeowners ask us

Can I stay in the house during a kitchen remodel?+
Yes, and almost everyone does. We set up a temporary station on day one, usually the fridge, microwave, coffee maker and a folding table in the dining room or garage, plus a utility sink where the plumbing allows. Expect to eat out more than usual for 2 to 5 weeks depending on scope.
Is refacing worth it, or should I just replace the cabinets?+
Refacing makes sense when the boxes are solid, the layout works and you like where everything sits. It runs roughly 40 to 60 percent of replacement cost. It is the wrong call if the boxes are particleboard and sagging, if you want different drawer configurations, or if you are changing the layout anyway. We will tell you which situation you are in at the consultation, including when the honest answer is that refacing is a waste of your money.
How far in advance do I need to pick cabinets?+
Cabinet lead time is the single biggest driver of your start date, currently running 4 to 8 weeks depending on the line. We do not schedule demo until your cabinets have a confirmed delivery date, because a kitchen sitting gutted while it waits on a truck is the fastest way to a miserable remodel.
Do you handle permits for kitchen work?+
Yes. We pull permits in the City of Houston and in Harris, Fort Bend, Montgomery and Brazoria counties, and we schedule the inspections. Permits are included in your quoted price. A cosmetic refresh that does not move plumbing, gas or electrical usually does not need one. Anything involving wall removal, a relocated sink or a new circuit does.
What do you find most often once demo starts?+
In Houston homes built before 1985, the two most common surprises are galvanized supply lines that should be replaced while the wall is open, and undersized electrical service that cannot carry a modern appliance load. Both get photographed, priced in writing and approved by you before any work resumes.
Can I supply my own appliances or fixtures?+
Yes. We will install appliances, fixtures and tile you supply, but our 10 year workmanship warranty covers our labor only, not the product. You are responsible for ordering the right quantity and for anything that arrives damaged or short, which becomes a schedule delay we cannot control.
Remodeled bathroom with a white vanity and a tiled tub surround
Also doing a bathroom?

Bathroom remodeling

Full rebuilds, tub-to-shower conversions and accessible bathrooms, from 2 days to 3 weeks. Homeowners who book both rooms in the same contract save on mobilization and get one continuous schedule.

Call NowFree Quote